OUR WORKS WITHIN THE SCOPE OF DRINKING WATER NETWORK LINE

Drinking Water Network

The most significant problem in drinking water networks is leaks. In some settlements, water losses reach 60–70%. Therefore, networks must be modeled to minimize water leaks. It is essential to determine a suitable reservoir location, ensure easy control in the network, detect leaks easily, and avoid long-term water problems in settlements.

Some of the works carried out while preparing drinking water network projects are listed below:

  • Preliminary survey and determination of the current situation
  • Determining the new reservoir requirements
  • Opening research pits or drilling in various locations of the reservoir and network
  • Determining the main pipeline route of the network
  • Conducting mapping and application works along the main pipeline route
  • Dividing the network into sections and determining pressure zones
  • Determining daily and hourly water consumption in the network
  • Producing various scenarios to ensure the drinking water system can meet the demand even under the most adverse conditions
  • Performing hydraulic calculations
  • Preparing projects of civil structures
  • Preparing quantities and estimates

TaabSoft Kurumsal alt yapısı ile hazırlanmıştır.